Skip to content
Chargebay EdgeBox: EV charging load management your electrician can install
Chargebay EdgeBox

Fit more EV chargers on the supply you already have

EdgeBox is a load controller your electrician installs and sets up in a browser. It reads the site meter and shares the spare capacity between chargers, so the site can take more of them without a grid upgrade.

  • Works with the OCPP 1.6J chargers you already have
  • Set up in a browser, no engineering study
  • No ongoing licence fees on the base model
How EdgeBox works EdgeBox reads the site meter over Modbus TCP and sends each EV charger its own limit over OCPP 1.6J. It can proxy to a charging platform and sends data to your cloud or building management system. OPTIONAL Charging platform (CSMS) OCPP PROXY SITE METER Main switchboard Modbus TCP ON SITE EdgeBox OCPP 1.6J EV charger 1 EV charger 2 and more HTTPS · MQTT · API DATA AND SCHEDULES Your cloud or BMS
EdgeBox sits between the site meter and the chargers
Why EdgeBox

More chargers, lower bills, same grid connection

A bigger grid connection can cost more than the chargers and take months to approve. EdgeBox lets the site share the supply it already has.

Install more chargers

Size the charging for the site, not the worst case. EdgeBox shares the supply between chargers, so you fit more of them on the existing connection.

Save money on energy

Skip the cost of a bigger connection, keep maximum demand under a limit you set, and schedule charging into cheaper tariff windows.

Use the full connection

The building is served first and the chargers use the headroom that is left, as it changes through the day.

Built for electricians

If you can fit a meter and a charger, you can commission EdgeBox

Everything is set in a web configurator built for installers. No coding, and no need to wait on us.

  1. Mount and connect Fit the unit in the board and connect it to the site network.
  2. Add the meter Enter the site meter's Modbus TCP details. The Siemens PAC2200 and other common meters are supported.
  3. Add the chargers Point each OCPP 1.6J charger at EdgeBox. An existing charging platform keeps working through the OCPP proxy.
  4. Set the site limit Enter the limit from your maximum demand calculation. EdgeBox does the rest.
What it does

Works with what the site already has

Reads the site meter

EdgeBox polls the meter over Modbus TCP, including the Siemens PAC2200, and works out the capacity left after the building load.

Building served first

The chargers use the headroom that is left as it changes through the day, and stay under a demand limit you set.

Works with OCPP 1.6J chargers

Existing chargers that speak OCPP 1.6J can be managed. No need to rip them out.

Charge when energy is cheaper

Send schedules through the API to move charging into off-peak tariff windows, or hold it back during a peak.

Keeps your billing platform

Charger traffic is passed through to your charging platform, so billing and driver apps carry on as they are.

Data you can use

One-minute interval data and maximum demand are logged and sent to your cloud or building system over HTTPS or MQTT.

Where it fits

Sites where every kilowatt counts

Apartment buildings

Put a charger in more bays without upgrading the building's connection, and add more as residents switch to EVs.

Workplaces and commercial

Charge staff and visitor cars inside the existing supply, with a demand limit that keeps peak charges in check.

Fleet depots

Charge the fleet overnight on the connection you have, using off-peak rates and the capacity the depot does not need after hours.

Clubs, venues and destinations

Charge visitors' cars on the headroom left when kitchens, bars and pumps are quiet, and back off when they are not.

Shop

EdgeBox and the chargers to go with it

Order online and have your own electrician install it. Send us a message if you are not sure what suits the site.

Browse the shop
  • Chargebay EdgeBox load controller on Moxa UC-8200 hardware

    Chargebay EdgeBox Load Controller

    $2,990.00 incl GST
    Add to cart
  • Sale! AUTEL MaxiCharger 7kW with energy meter

    AUTEL Energy Management System Solution – Maxicharger 7kW + Energy Meter

    Original price was: $2,299.00.Current price is: $1,299.00. incl GST
    Add to cart
  • Sale! AUTEL MaxiCharger AC wallbox 7kW with tethered cable

    AUTEL Intelligent MaxiCharger AC Wallbox – 7kW, 5m Cable

    Original price was: $1,199.00.Current price is: $999.00. incl GST
    Add to cart
  • Sinexcel SEC 40-80kW DC fast charger

    Sinexcel SEC 40-80kW DC Charger

    Details and quote
Bigger projects

Need more than a controller?

Chargebay started as an offshoot of Teck Global, a high voltage engineering and switchroom business. For large or complex sites we can also take on the design and delivery.

Project delivery

Support
Stuck during set-up? Send us a message.
Warranty
1 year product warranty when bought through chargebay.com.au.
Office
Malaga, Western Australia.
Chargebay EdgeBox

Ready to fit EdgeBox?

Order online for $2,990 inc GST and have your electrician set it up. If you want to talk a site through first, send us a message.